More Specialist Services

CDMS are able to provide design and design verification services beyond the scope of conventional engineering techniques. With over 24 years experience in mechanical and structural design design, and engineers trained in the use of FEA, we ensure that your design will be completed successfully.

Shown below is a partial listing of some work we have completed successfully.




CDMS performed verification for the complex shaped pressure vessels on a new calciner for Alcan Grove. The designers used FEA for the complete pressure vessel system which was verified by CDMS using FEA.




CDMS performed FEA verification of the wagon shown below.




Other examples of CDMS work include:

  • The transport of Monopods each 137 Tonne x 56m long for Wapet Roller / Skate projects required checks on transport supports.
  • Transport and lifting cradles for heat exchanger tube bundles for Murrin Murrin Nickel Project and Olympic Dam Project. Tube bundle weights to 162 tonne and are 5.7m diameter x 10.2m long.
  • Temporary supports for Rail Car Dumpers Dampier and Port Hedland.
  • Lifting and tailing lug / trunnion design for Robe River Stacker & Reclaimer assemblies.
  • Lifting study and design of lifting attachments for relocation of a vertical refractory lined Multiple Hearth Furnace of 80 tonne approx. dry weight.
  • Lifting and transport attachments for approx. 50 modules of various shapes & sizes up to 150 tonnes each for Beenup Mineral Sands Project - pontoons and dredge. Also devices for lifting and handling large silo segments.
  • Erection support structures, working platforms and lifting beam for Windimurra Rotary Kiln. Kiln was elevated approx 6m above ground and was prefabricated in sections weighing up to 90T each.
  • Flare tip replacement study and design of special davit, platforms and erection aids required for Harriet Alpha Flare Tip replacement (offshore).
  • 65T SWL Lifting Frame for lifting of Air Cooled Heat Exchangers on Woodside LNG Train 4 Project.
  • Lifting study / design of lifting beams, lift lugs, tailing connections to sections of a 6.5m dia x 60m high stack for Alstom Power/Western Power Kwinana Power Station – Heaviest section lift 93Tonne.
  • FEA of various pipe supports for Woodside Train IV project for loadings beyond manufacturer’s tabulated values.
  • FEA of Woodside Vent Stack hot tap split tee – welds and reinforcement.